| Court package |
Glass, steel, turf, net, doors, accessories, and brand/spec choices set the visible court-system price. |
Ask whether the number is supply-only, installed court system, or complete project cost. |
| Outdoor site work |
Drainage, flatness, anchors, wind exposure, corrosion, access, and slab readiness can move the real cost more than the court kit. |
Price base, drainage, civil work, and site restoration as separate lines. |
| Lighting and approvals |
Evening play can add poles, fixtures, trenching, controls, glare review, permits, and operating-hour limits. |
Confirm whether lighting, electrical, engineering, and local review are included or excluded. |
| Permits and exclusions |
Outdoor quotes can hide noise review, utility upgrades, access repairs, landscaping restoration, or post-install cleanup. |
Ask for an exclusions list and a named owner for every approval, repair, and handover item. |