| Court system |
Glass, steel, turf, net, accessories, doors, freight, and brand/spec choices drive the supplier side of the price. |
Ask whether the number is factory, landed, installed, or complete project cost. |
| Site-ready work |
Base, drainage, grading, demolition, access, unloading, storage, and restoration can change the real build price. |
Require site-prep and foundation assumptions as separate lines. |
| Local conditions |
Labor, freight, wind, soil, drainage, utility access, and review requirements can make the same court package price differently across U.S. sites. |
Record city, site status, indoor/outdoor setting, lighting need, and permit questions before requesting prices. |
| Approval and handover |
Engineering, permits, inspections, electrical scope, lighting, service documents, and punch-list work affect the final obligation. |
Ask who owns each item before comparing totals. |