| Civil work |
Foundation, drainage, grading, demolition, and access can sit outside court-package pricing. |
Ask for slab, base, drainage, access, and restoration line items. |
| Electrical and lighting |
Fixtures may be quoted without poles, trenching, controls, panel capacity, or permits. |
Separate lighting equipment from electrical installation and approval. |
| Logistics |
Freight, unloading, staging, cranes, storage, duties, and damaged-part replacement can be missed. |
Ask for landed and installed pricing, not only factory or kit price. |
| Approvals |
Drawings, engineering, inspections, and municipal responses may be buyer-owned unless stated. |
Put permit and engineering responsibility in writing. |
| Handover |
Warranty, maintenance instructions, spare parts, and aftercare affect ownership cost. |
Ask what happens after installation day. |